sur Banyan Gold Corp. (CVE:BYN)
Banyan Gold Reports High-Grade Gold Intersections at Yukon Project
Banyan Gold Corp. has announced promising drilling results from its Powerline Deposit at the AurMac Project in Yukon, Canada. A standout result from drillhole AX-26-891 shows an impressive 149.14 grams per tonne (g/t) of gold over 0.4 meters, within a wider interval of 0.56 g/t gold over 169.2 meters. Another significant finding from drillhole AX-26-892B includes 1.05 g/t gold over 52.8 meters. These results highlight the potential to enhance the grade and continuity of mineralized domains in the area.
The ongoing 2026 drill program aims to convert, expand, and delineate higher-grade mineralized domains. Other notable intersections include AX-26-878 with 1.37 g/t gold over 11.8 meters, and AX-26-876, showing 1.15 g/t gold over 13.9 meters. The data supports the company's strategy of targeting high-grade domains to improve the AurMac resource's grade profile and confidence.
R. P.
Copyright © 2026 FinanzWire, tous droits de reproduction et de représentation réservés.
Clause de non responsabilité : bien que puisées aux meilleures sources, les informations et analyses diffusées par FinanzWire sont fournies à titre indicatif et ne constituent en aucune manière une incitation à prendre position sur les marchés financiers.
Cliquez ici pour consulter le communiqué de presse ayant servi de base à la rédaction de cette brève
Voir toutes les actualités de Banyan Gold Corp.